{"id":7991,"date":"2026-07-16T08:00:00","date_gmt":"2026-07-16T08:00:00","guid":{"rendered":"https:\/\/techmonarch.com\/in\/?post_type=blog&#038;p=7991"},"modified":"2026-06-30T12:41:06","modified_gmt":"2026-06-30T12:41:06","slug":"the-most-common-it-infrastructure-mistakes-during-office-expansion-projects","status":"publish","type":"blog","link":"https:\/\/techmonarch.com\/in\/blog\/the-most-common-it-infrastructure-mistakes-during-office-expansion-projects\/","title":{"rendered":"The Most Common IT Infrastructure Mistakes During Office Expansion Projects"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\"><strong>The Most Common IT Infrastructure Mistakes During Office Expansion Projects<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Office expansion projects tend to follow a predictable pattern. The business case is made, the new space is found, and a flurry of activity begins around construction, fitout, furniture, and move logistics. IT infrastructure enters the conversation eventually \u2014 but rarely early enough.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">By the time cabling requirements, network design, ISP lead times, and access control systems make it onto the project plan, decisions have already been made that constrain what\u2019s possible. Walls are in the wrong place. Power outlets are positioned without any reference to where workstations will sit. The server room \u2014 if there is one \u2014 has been allocated the smallest room available, the one nobody else wanted.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The frustrating part is that most of these mistakes are entirely avoidable. They don\u2019t happen because companies are careless. They happen because IT infrastructure is treated as something that gets plugged in after the real work is done, when it\u2019s actually a foundational layer that shapes how every other part of the expansion functions. What follows is a clear-eyed look at where things go wrong most often, and what the alternative looks like.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Mistake 1: Involving IT Too Late in the Project Timeline<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">This is the root cause behind the majority of everything else on this list. When IT teams or <a href=\"https:\/\/techmonarch.com\/in\/it-infrastructure-setup\/\">IT infrastructure partners<\/a> are brought in after the physical layout is finalized \u2014 or worse, after construction is complete \u2014 they\u2019re forced to work within constraints that didn\u2019t have to exist.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Network drops that should be distributed evenly across a floor plan end up concentrated in one corner because that\u2019s where the conduit was run. Meeting rooms lack the ceiling infrastructure for wireless access points. The comms room is in a location that makes cable runs unnecessarily long and expensive. Every one of these problems has a solution, but those solutions cost more and take longer when implemented as corrections than they would have as decisions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The rule of thumb from experienced IT infrastructure teams is consistent: involve your IT partner or internal team at the same time you involve your architect. Not after the drawings are approved. Not once the contractor is on-site. At the same time. That alignment is what allows infrastructure requirements to be built into the design rather than retrofitted around it.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Mistake 2: Underestimating ISP Lead Times<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Internet connectivity is so fundamental to office operations that most expansion teams assume it will simply be available when the new space opens. That assumption gets tested, repeatedly, when the reality of ISP provisioning timelines becomes clear.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Bringing a new fibre connection into a building \u2014 particularly in a multi-tenant commercial property, or in a location that hasn\u2019t previously had a high-bandwidth connection \u2014 can involve construction permits, physical works, and coordination between multiple parties. Lead times of 60 to 90 days are common. In some locations, they run longer. A business that starts this process four weeks before the expansion go-live date is almost certainly going to open a new office with no internet, or with a temporary mobile connection that\u2019s wholly inadequate for business operations.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The fix is straightforward: ISP engagement needs to happen in parallel with site selection, not after it. The connectivity options available at a prospective location should be part of the evaluation criteria, not an afterthought. And backup connectivity \u2014 a secondary ISP, a 4G\/5G failover option \u2014 needs to be part of the design from the start, not something added later when the primary connection has its first outage.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><a href=\"https:\/\/techmonarch.com\/in\/contact-us\/\"><img loading=\"lazy\" decoding=\"async\" width=\"621\" height=\"181\" src=\"https:\/\/techmonarch.com\/in\/wp-content\/uploads\/2025\/12\/IT-Infra-01-1.png\" alt=\"\" class=\"wp-image-7862\" style=\"width:840px;height:auto\" srcset=\"https:\/\/techmonarch.com\/in\/wp-content\/uploads\/2025\/12\/IT-Infra-01-1.png 621w, https:\/\/techmonarch.com\/in\/wp-content\/uploads\/2025\/12\/IT-Infra-01-1-300x87.png 300w\" sizes=\"auto, (max-width: 621px) 100vw, 621px\" \/><\/a><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Mistake 3: Cabling for Current Headcount, Not Future Growth<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Structured cabling is one of those infrastructure elements where the cost of doing it right the first time is modest, and the cost of going back to do it properly is disproportionately high. Yet it\u2019s remarkably common for expansion projects to cable a space for its current configuration \u2014 the number of desks being fitted out today \u2014 with no buffer for growth.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Twelve months later, when a team of 30 has grown to 42, the cabling that seemed adequate is now a constraint. Additional drops need to be run, walls need to be opened, and work happens in an occupied space rather than during fitout. The disruption is real, the cost is higher, and all of it was predictable.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The guidance from infrastructure professionals is consistent: plan for at least 20 to 30 percent additional capacity over the current requirement. This means additional cable drops, additional switch ports, additional conduit space for future runs. The incremental cost during fitout is minimal compared to the cost of remediation later. The same logic applies to power: every workstation should have both data and power in the right place, not in the closest available location.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Mistake 4: Treating Wi-Fi as an Afterthought<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Wireless network design is more nuanced than it appears, and this is one area where confident non-specialists consistently underestimate what\u2019s involved. Placing a handful of access points in a new space and assuming coverage will work out is a strategy that reliably produces dead zones, interference issues, and congestion in high-density areas.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A proper wireless deployment for a business environment starts with a site survey \u2014 an assessment of the physical space, building materials, interference sources, and density requirements that determines where access points should go, what specification they need to be, and how they should be configured relative to each other. This isn\u2019t a complex or expensive process, but it\u2019s a step that gets skipped when Wi-Fi is treated as a commodity rather than as designed infrastructure.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The consequence in an office environment is not just connectivity complaints. Video calls drop in certain meeting rooms. File transfers that should take seconds drag on for minutes. Collaboration tools behave inconsistently depending on where someone sits. These issues don\u2019t announce themselves as wireless problems \u2014 they surface as vague performance complaints that are difficult to diagnose and frustrating to resolve after the fact.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Mistake 5: Security Architecture Gets Designed in Isolation<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Expansion is a natural moment to revisit security architecture, but it\u2019s also a moment when security decisions often get made in ways that don\u2019t account for the broader environment. The new location gets its own network, its own access controls, its own set of tools \u2014 and the relationship between the new site and the existing one is handled ad hoc, with VPN tunnels and firewall rules bolted on after the fact.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The result is a multi-site environment with inconsistent security posture. Policy enforcement that applies at the main office doesn\u2019t apply at the new one. Access controls between the two locations are poorly defined. Monitoring and logging cover one site comprehensively and the other partially. Every seam between the two environments is a place where configuration inconsistency creates risk.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The right approach is to design security architecture for the expanded environment as a whole, not separately for each location. Network segmentation, identity management, access control, monitoring, and incident response procedures need to work across both sites from day one. This requires involvement from whoever manages security architecture before the new site is live, not after the first security review surfaces problems.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Mistake 6: No Continuity Plan for the Transition Period<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The period immediately before and after a new office goes live is when existing systems are most at risk. Equipment is being moved. Configurations are changing. Network paths that were stable are being altered. People are operating in unfamiliar environments and making ad hoc decisions about technology that they\u2019d never make in a stable context.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Businesses that don\u2019t plan explicitly for this transition period frequently experience their worst IT incidents during it. Not because anything catastrophic was done, but because the combination of change, distraction, and compressed timelines creates conditions where small errors compound into significant problems.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A proper transition plan sequences the work carefully: infrastructure is built and tested before equipment moves, critical systems are verified live in the new location before the old ones are taken offline, and there\u2019s a defined rollback path for the scenarios that matter most. This isn\u2019t overengineering \u2014 it\u2019s the difference between an expansion that goes smoothly and one that takes weeks to stabilize.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Mistake 7: Documentation Is Left Until Last \u2014 and Then Never Happens<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Every office expansion produces a new configuration baseline: new network topology, new device inventory, new cabling schedules, new access control mappings. In a well-run project, that documentation is produced as the work is done and handed over as part of project completion. In most projects, documentation is deferred to the end, and the end never quite arrives.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Six months after the expansion, the person who set up the new site has moved on or is managing other priorities. The network configuration exists in a state somewhere between what was designed, what was actually implemented, and the several small changes made since. Nobody has a complete, accurate picture of what\u2019s running and why.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This matters most when something breaks. Troubleshooting an environment you don\u2019t have documentation for is slower, riskier, and more expensive than troubleshooting one you do. It also matters when the business expands again, and whoever is planning the next site needs to understand the current one. Documentation produced during a project costs almost nothing additional. Documentation reconstructed afterward costs significantly more and is rarely complete.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Getting It Right From the Start<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The through-line across all of these mistakes is timing. IT infrastructure decisions made early in an expansion project cost less, create fewer constraints, and produce better outcomes than the same decisions made under pressure once construction is underway. The technology choices themselves are rarely the hard part \u2014 what\u2019s hard is working within the constraints created by decisions made before IT had a seat at the table.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For businesses planning expansion in Ahmedabad, Gandhinagar, or anywhere across Gujarat, the most valuable thing you can do before signing a new lease is sit down with your IT team or infrastructure partner and work through the connectivity, cabling, security, and transition requirements while the floor plan is still fluid. That conversation is worth considerably more at the beginning of a project than at the end of it.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">TechMonarch supports businesses through IT infrastructure planning and execution for exactly these kinds of projects \u2014 bringing structure to the process early enough that the common mistakes don\u2019t make it into the build.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>The best time to plan IT infrastructure for a new office is before anyone has chosen the furniture. The second best time is right now.<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Most Common IT Infrastructure Mistakes During Office Expansion Projects Office expansion projects tend to follow a predictable pattern. The business case is made, the new space is found, and&#8230;<\/p>\n","protected":false},"featured_media":7992,"comment_status":"open","ping_status":"closed","template":"","blog_category":[],"class_list":["post-7991","blog","type-blog","status-publish","has-post-thumbnail","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>The Most Common IT Infrastructure Mistakes During Office Expansion Projects - techmonarch\/in<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/techmonarch.com\/in\/blog\/the-most-common-it-infrastructure-mistakes-during-office-expansion-projects\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"The Most Common IT Infrastructure Mistakes During Office Expansion Projects - techmonarch\/in\" \/>\n<meta property=\"og:description\" content=\"The Most Common IT Infrastructure Mistakes During Office Expansion Projects Office expansion projects tend to follow a predictable pattern. The business case is made, the new space is found, and...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/techmonarch.com\/in\/blog\/the-most-common-it-infrastructure-mistakes-during-office-expansion-projects\/\" \/>\n<meta property=\"og:site_name\" content=\"techmonarch\/in\" \/>\n<meta property=\"og:image\" content=\"https:\/\/techmonarch.com\/in\/wp-content\/uploads\/2026\/06\/05_IT_Mistakes_Office_Expansion.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/techmonarch.com\\\/in\\\/blog\\\/the-most-common-it-infrastructure-mistakes-during-office-expansion-projects\\\/\",\"url\":\"https:\\\/\\\/techmonarch.com\\\/in\\\/blog\\\/the-most-common-it-infrastructure-mistakes-during-office-expansion-projects\\\/\",\"name\":\"The Most Common IT Infrastructure Mistakes During Office Expansion Projects - techmonarch\\\/in\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/techmonarch.com\\\/in\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/techmonarch.com\\\/in\\\/blog\\\/the-most-common-it-infrastructure-mistakes-during-office-expansion-projects\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/techmonarch.com\\\/in\\\/blog\\\/the-most-common-it-infrastructure-mistakes-during-office-expansion-projects\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/techmonarch.com\\\/in\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/05_IT_Mistakes_Office_Expansion.png\",\"datePublished\":\"2026-07-16T08:00:00+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/techmonarch.com\\\/in\\\/blog\\\/the-most-common-it-infrastructure-mistakes-during-office-expansion-projects\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/techmonarch.com\\\/in\\\/blog\\\/the-most-common-it-infrastructure-mistakes-during-office-expansion-projects\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/techmonarch.com\\\/in\\\/blog\\\/the-most-common-it-infrastructure-mistakes-during-office-expansion-projects\\\/#primaryimage\",\"url\":\"https:\\\/\\\/techmonarch.com\\\/in\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/05_IT_Mistakes_Office_Expansion.png\",\"contentUrl\":\"https:\\\/\\\/techmonarch.com\\\/in\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/05_IT_Mistakes_Office_Expansion.png\",\"width\":1672,\"height\":941},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/techmonarch.com\\\/in\\\/blog\\\/the-most-common-it-infrastructure-mistakes-during-office-expansion-projects\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/techmonarch.com\\\/in\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Blog\",\"item\":\"https:\\\/\\\/techmonarch.com\\\/in\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"The Most Common IT Infrastructure Mistakes During Office Expansion Projects\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/techmonarch.com\\\/in\\\/#website\",\"url\":\"https:\\\/\\\/techmonarch.com\\\/in\\\/\",\"name\":\"techmonarch\\\/in\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/techmonarch.com\\\/in\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"The Most Common IT Infrastructure Mistakes During Office Expansion Projects - techmonarch\/in","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/techmonarch.com\/in\/blog\/the-most-common-it-infrastructure-mistakes-during-office-expansion-projects\/","og_locale":"en_US","og_type":"article","og_title":"The Most Common IT Infrastructure Mistakes During Office Expansion Projects - techmonarch\/in","og_description":"The Most Common IT Infrastructure Mistakes During Office Expansion Projects Office expansion projects tend to follow a predictable pattern. The business case is made, the new space is found, and...","og_url":"https:\/\/techmonarch.com\/in\/blog\/the-most-common-it-infrastructure-mistakes-during-office-expansion-projects\/","og_site_name":"techmonarch\/in","og_image":[{"width":1672,"height":941,"url":"https:\/\/techmonarch.com\/in\/wp-content\/uploads\/2026\/06\/05_IT_Mistakes_Office_Expansion.png","type":"image\/png"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/techmonarch.com\/in\/blog\/the-most-common-it-infrastructure-mistakes-during-office-expansion-projects\/","url":"https:\/\/techmonarch.com\/in\/blog\/the-most-common-it-infrastructure-mistakes-during-office-expansion-projects\/","name":"The Most Common IT Infrastructure Mistakes During Office Expansion Projects - techmonarch\/in","isPartOf":{"@id":"https:\/\/techmonarch.com\/in\/#website"},"primaryImageOfPage":{"@id":"https:\/\/techmonarch.com\/in\/blog\/the-most-common-it-infrastructure-mistakes-during-office-expansion-projects\/#primaryimage"},"image":{"@id":"https:\/\/techmonarch.com\/in\/blog\/the-most-common-it-infrastructure-mistakes-during-office-expansion-projects\/#primaryimage"},"thumbnailUrl":"https:\/\/techmonarch.com\/in\/wp-content\/uploads\/2026\/06\/05_IT_Mistakes_Office_Expansion.png","datePublished":"2026-07-16T08:00:00+00:00","breadcrumb":{"@id":"https:\/\/techmonarch.com\/in\/blog\/the-most-common-it-infrastructure-mistakes-during-office-expansion-projects\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/techmonarch.com\/in\/blog\/the-most-common-it-infrastructure-mistakes-during-office-expansion-projects\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/techmonarch.com\/in\/blog\/the-most-common-it-infrastructure-mistakes-during-office-expansion-projects\/#primaryimage","url":"https:\/\/techmonarch.com\/in\/wp-content\/uploads\/2026\/06\/05_IT_Mistakes_Office_Expansion.png","contentUrl":"https:\/\/techmonarch.com\/in\/wp-content\/uploads\/2026\/06\/05_IT_Mistakes_Office_Expansion.png","width":1672,"height":941},{"@type":"BreadcrumbList","@id":"https:\/\/techmonarch.com\/in\/blog\/the-most-common-it-infrastructure-mistakes-during-office-expansion-projects\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/techmonarch.com\/in\/"},{"@type":"ListItem","position":2,"name":"Blog","item":"https:\/\/techmonarch.com\/in\/blog\/"},{"@type":"ListItem","position":3,"name":"The Most Common IT Infrastructure Mistakes During Office Expansion Projects"}]},{"@type":"WebSite","@id":"https:\/\/techmonarch.com\/in\/#website","url":"https:\/\/techmonarch.com\/in\/","name":"techmonarch\/in","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/techmonarch.com\/in\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/techmonarch.com\/in\/wp-json\/wp\/v2\/blog\/7991","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/techmonarch.com\/in\/wp-json\/wp\/v2\/blog"}],"about":[{"href":"https:\/\/techmonarch.com\/in\/wp-json\/wp\/v2\/types\/blog"}],"replies":[{"embeddable":true,"href":"https:\/\/techmonarch.com\/in\/wp-json\/wp\/v2\/comments?post=7991"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/techmonarch.com\/in\/wp-json\/wp\/v2\/media\/7992"}],"wp:attachment":[{"href":"https:\/\/techmonarch.com\/in\/wp-json\/wp\/v2\/media?parent=7991"}],"wp:term":[{"taxonomy":"blog_category","embeddable":true,"href":"https:\/\/techmonarch.com\/in\/wp-json\/wp\/v2\/blog_category?post=7991"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}